WalkRound MEP

Early access site visit reports

Home

WalkRound dashboard

Simple site walkround reports with actions, photos, checks and clean PDF export.

Early access build. Please check all reports before issuing and avoid uploading confidential project information during testing.
How to test WalkRound
  • Start a project
  • Create a visit
  • Add an action/photo
  • Add an RFI/check
  • Preview / export the report

Early access data is saved on this device only. Export a backup if needed.

Visits

Project RFIs / checks

Optional. Use this for RFIs, email queries or site checks. They stay out of the report unless included, closed, action raised or further information required.

Visit details

Report wording bank
General Quality Pre closure Hold point Snagging Pre commissioning Commissioning Handover Aftercare Survey Compliance
Visit templates V4.2

Built from the uploaded Clerk of Works, BSRIA/CIBSE, UCL MEP, BS7671, GN3, GS38 and handover sources. Preloads purpose, summary, discipline notes, action wording and suggested checks. Suggested checks stay hidden from the report unless used.

General Quality / installation First fix Pre closure Hold point Plant room Riser Snagging Pre commissioning Mech witnessing Elec witnessing Handover Aftercare Existing survey Compliance

Checks & Queries

Template checks stay compact. Add real RFIs or PDFs where needed.

Discipline notes

Actions

New actions appear at the top while you are working. The report still keeps the action refs.

General photo log

Floor plans

Optional. Upload single sheet PDFs or a multi page PDF, name the plan and revision, then add location pins to actions, RFIs or photos.

Feedback / Suggestions

For testing feedback, bugs, wording comments and report layout notes. Notes on this screen are saved on this device only and do not get sent back automatically.